Migrations are the highest-stakes discipline in enterprise infrastructure. Data has to move, applications have to stay running, dependencies have to survive the transition, and recovery objectives have to hold throughout. Most problems don’t show up on the design — they show up at the halfway point.
We approach migration as a sequenced, validated, rollback-ready discipline. Dependency mapping comes first. Workload behavior is modeled. Performance under load is tested in staging. Rollback paths are engineered — and proven — before the cutover window opens.
We’ve led migrations across M&A consolidation, storage refresh, hybrid cloud transition, EMR consolidation, and post-acquisition integration. The common thread: the migration plan is a document we validate — not a plan we hope works.